Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11422/14004
Especie: Dissertação
Título : Avaliação de procedimentos de descida e transporte de equipamentos para perfuração de poços offshore pela coluna de Riser
Otros títulos: Evaluation of procedures for deployment and transportation of offshore drilling equipment using the Riser column
Autor(es)/Inventor(es): Freitas, Aline Esperança de Sá
Tutor: Corrêa, Fabrício Nogueira
Tutor : Jacovazzo, Bruno Martins
Resumen: Devido à grande demanda de produtos provenientes do petróleo, as produtoras foram levadas a buscar novos reservatórios, explorando zonas offshore com lâminas d’água que chegam a profundidades acima dos 3000 metros. Nessa busca por reservatórios localizados em águas cada vez mais profundas, as operações que envolvem instalação de equipamentos no fundo marinho vêm se tornando cada vez mais críticas e por isso demandam a execução de projetos cada vez mais detalhados com simulações e análises que representem de forma fiel o cenário real. Além disso, algumas operações podem apresentar tempo de execução muito elevado, como por exemplo o transporte destes equipamentos. Este trabalho usa como objeto de estudo o conjunto de equipamentos BOP/LMRP. Esses equipamentos são utilizados na etapa de perfuração de poços, sua função é garantir a segurança do procedimento. Trata-se de equipamentos com grandes dimensões que podem gerar resultados críticos quando instalados ou transportados verticalmente através da coluna de riser , principalemnte nas chamadas zonas de ressonância. O objetivo deste trabalho é estudar estes procedimentos e os efeitos que eles causam na coluna de riser conectada aos equipamentos.
Resumen: Due the large demand of products derived from petroleum, the producers were led to search for new reservoirs, exploring offshore zones with water depths over 3000 meters. With the exploitation on deep waters , the process of the equipment installation on the seabed is becoming a critical factor and therefore requires the execution of very detailed numerical simulations and analysis to represent the real scenario faithfully. Another important factor is the transport of these equipments, that can require a lot of time. To constrain this problems, this dissertation uses the BOP stack as a study object. These equipment are used in drilling of wells procedure to ensure its safety. It has large dimensions and can present critical results during the vertical installations and transport operations using the riser column, especially if they are located in resonance zones. The main objective of this work is to study the mentioned procedure and the effects they cause in the riser connected to the equipment.
Materia: Instalação de BOP
Transporte de BOP
Offshore
Perfuração
Materia CNPq: CNPQ::ENGENHARIAS::ENGENHARIA CIVIL
Programa: Programa de Pós-Graduação em Engenharia Civil
Unidade de producción: Instituto Alberto Luiz Coimbra de Pós-Graduação e Pesquisa de Engenharia
Editor: Universidade Federal do Rio de Janeiro
Fecha de publicación: jun-2019
País de edición : Brasil
Idioma de publicación: por
Tipo de acceso : Acesso Aberto
Aparece en las colecciones: Engenharia Civil

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
AlineEsperancaDeSaFreitas.pdf8.49 MBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.