<link rel="stylesheet" href="styles.f3b1fba60ec7970c.css">
ATENÇÃO: O depósito de novas publicações está temporariamente suspenso.

Avaliação de métodos de controle da cravação de estacas: aplicação a dois casos de obras

Carregando...
Imagem de Miniatura

Título da Revista

ISSN da Revista

Título de Volume

Editor

Universidade Federal do Rio de Janeiro

DOI

Resumo

This work aimed at an analysis of the different methods of pile driving control. Initially the available methods are introduced together with their theoretical basis. Among them, the pile driving monitoring technique is presented in some detail, particularly the equipment developed at COPPE/UFRJ. The method based on the Wave-Equation is used in a parametric study with the purpose of evaluating the influence of input parameters. Finally, all methods are applied to two pilling jobs. In wich either static loading tests or pile driving monitoring (done by others) were available. From these applications, conclusions on the adequacy of the available methods are drawn.

Descrição

Palavras-chave

Citação

Avaliação

Revisão

Suplementado Por

Referenciado Por

Direitos e licensiamento

Acesso Aberto