Avaliação de métodos de controle da cravação de estacas: aplicação a dois casos de obras
Carregando...
Arquivos
Data
Autores
Título da Revista
ISSN da Revista
Título de Volume
Editor
Universidade Federal do Rio de Janeiro
DOI
Resumo
This work aimed at an analysis of the different methods of pile driving control. Initially the available methods are introduced together with their theoretical basis. Among them, the pile driving monitoring technique is presented in some detail, particularly the equipment developed at COPPE/UFRJ. The method based on the Wave-Equation is used in a parametric study with the purpose of evaluating the influence of input parameters. Finally, all methods are applied to two pilling jobs. In wich either static loading tests or pile driving monitoring (done by others) were available. From these applications, conclusions on the adequacy of the available methods are drawn.
Descrição
Palavras-chave
Citação
Coleções
Avaliação
Revisão
Suplementado Por
Referenciado Por
Direitos e licensiamento
Acesso Aberto